 |
Automatically test the Transmission Output Shaft for presence of thru hole and 6 cross holes. |
|
 |
Test Part is rotated while sensing the cross holes. |
 |
Software can be modified by the customer using a laptop and changing an excel work sheet. |
 |
The cycle time is 30 seconds. |
 |
Two types of Test Parts with different lengths can be tested. The changeover can be done in less than a few seconds.
|
 |
Tested Part is automatically moved to an unload station. |
 |
This equipment is controlled by a PLC. |
 |
This test stand is in a production environment. |